The Contractor shall ensure that the equipment has been designed and fabricated to good and prevailing commercial practice in accordance with applicable engineering codes and standards. 承包商应确保,设备的设计及制造依据良好且流行的商业惯例,符合适用的工程规范及标准。
Contractor has to accommodate anode ground bed within the allocated plot byemployer or contractor has to fix the location of anode ground bed as per applicable codes and standards and approved by employerincluding obtaining row at no additional cost toemployer. 承包商必须在业主分配的区段内提供阳极接地床,或者,承包商必须按照适用规范和标准确定阳极接地床的位置,并得到业主批准和row,而业主无需承担额外费用。
The company complies with international pact and rules of law, conforms to applicable codes, guidelines and standards; 公司严格遵守国际公约、规则和国家法律、法规的规定,符合适用的建议性规则、指南和标准的要求;
2.1 electrical equipment and system design, manufacture, testing and inspection, installation and commissioning shall comply with all currently applicable regulations, safety codes and standards. 2.1电气设备和系统设计、制造、试验与检验、安装及试运行应遵循目前适用的所有规定、安全规范和标准。
This article introduces the responsibilities, main work contents and applicable codes and standards as well as job specifications of start up and start up service management of different phases of project design, procurement, construction, start up and acceptance of chemical, petrochemical and pharmaceutical projects. 介绍工程公司在化工、石化或医药工程项目设计、采购、施工、开车及生产验收各阶段的开车/开车服务管理的工作职责、主要工作内容和方法以及所依据的标准/规范和作业文件。